Hours: Mon–Sat 09:00–18:00 No.3-8 Jinlong Rd, Dalong St, Panyu · Serving Panyu & Nansha

IDC Engineering Case Record

Server room full chain service· 6 cases + 2 records

IDC engineering case studiess (6 cases)

Click on any case to view the complete process: receiving → testing → processing → delivery, including time, results and customer feedback. These cases come from our 2025–2026 service records.

IDC Data-Center Engineering (6 cases)

Server room construction/relocation/environmental monitoring

IDC data centre reconstruction of a bank branch: cold and hot channel + intelligent PDU deployment
🗃️ Cases
IDC data centre reconstruction of a bank branch: cold and hot channel + intelligent PDU deployment
IDC Data Center was reconstructed for Panyu Branch of a bank, and 12 42U racks, 2 sets of 20kVA UPS and cold and hot channel closed system were deployed to reduce PUE by 15%.
Internet enterprise data center cabling: 100 racks +MPO pre-terminated fiber
🔌Cases
Internet enterprise data center cabling: 100 racks +MPO pre-terminated fiber
Implement comprehensive cabling for an Internet enterprise data center in Guangzhou, including 100 racks, 2000 Class 6 information points and OM4 MPO pre-terminated optical fiber system.
Hospital data center environmental CCTV system deployment: real-time monitoring + SMS alarm
🔒Cases
Hospital data center environmental CCTV system deployment: real-time monitoring + SMS alarm
Deploy environmental CCTV system for a hospital in Nansha District, monitor temperature and humidity, smoke detection and UPS status of 50 racks, and realize SMS + WeChat + telephone multi-channel alarm.
Enterprise self-built server room relocation: 48 hours without downtime migration
🏢Cases
Enterprise self-built server room relocation: 48 hours without downtime migration
Move the core server room of the enterprise to the new site as a whole, cut off in batches, monitor throughout, complete within 48 hours and have zero business interruption.
Modular server room construction: 20 racks + environmental monitoring
🏢Cases
Modular server room construction: 20 racks + environmental monitoring
20 new modular racks for technology companies, including power distribution, refrigeration and environmental monitoring, a single acceptance test.
Old server room finishing: wiring + power distribution transformation
🏢Cases
Old server room finishing: wiring + power distribution transformation
The wiring, labeling and power distribution transformation of the chaotic old server room have significantly improved the troubleshooting efficiency.

Server room operation and maintenance record articles (2)

Original long article by engineer, including complete troubleshooting process, accessory model and charging details

Having computer or network problems?

A 15-year engineering team delivering professional, efficient and transparent one-stop IT services

📱 18825126836 Consult Now online appointment