We do integrated construction of monitoring/access/alarm and old system transformation, factories, shops, office buildings, residential areas have done; At the same time do Guangzhou monitoring wholesale (Haikang/Dahua camera, NVR, monitoring panel wholesale price spot), equipment + construction a responsible.

Monitoring is the easiest system to "install is not installed". The difference lies in the details:

access control system: Select to see the scene-office glass door with magnetic lock + fingerprint/password one machine; factory passage with three-roller gate/wing gate; community and garage with barrier gate + license plate recognition. We focus on two things: ①outage plan: Fire protection requires automatic door opening (escape) due to power failure, but security also requires power failure locking (anti-chaos entry). Different doors should be configured with normally open/normally closed logic respectively, which is a place where many guerrilla construction teams are confused;②authority management: Immediate cancellation of employee permission on the day of resignation, time-division permission (cleaning can only be entered during working hours), temporary authorization of visitors. With equipment that supports cloud management, mobile phones can operate without running the server room.
burglar alarm: Store/warehouse/financial room scene. Infrared curtain + door magnet + glass broken detector partition defense, linkage sound and light alarm + push mobile phone. False alarm rate is the lifeline of the alarm system-pet trigger, air conditioning airflow trigger, direct sunlight trigger false alarm will make users directly abandon the system, sensitivity debugging and location selection during installation are manual work. Alarm system suggests linkage monitoring (alarm trigger automatically pops up corresponding screen video), evidence chain is complete when an accident occurs.

A lot of customers old CCTV system (analog era installed) picture paste, hard drive broken record, mobile phone cannot see, want to change and afraid of spending more. Actual transformation than you think of the province:
In April 2026, the old simulation monitoring of a hardware warehouse in Hualong (16 roads, installed for 8 years) The picture is blurred to distinguish the figure, the hard drive has long been broken equal to no video, the boss is determined to transform. The original plan is to completely dismantle and reinstall the IP system, the quote is more than 40,000. After our on-site investigation, we changed the plan: the warehouse area is 8 meters high and the cable is difficult. The 11 coaxial cables in 16 roads are in good condition. Change the TVI HD camera to reuse the existing gear line; the 5 roads with network cable in the office building area are directly connected to the IP camera; 32-way NVR (reserved expansion)+2 4T monitoring panels. The actual cost of RMB 23,000, saving nearly half, the construction period from two weeks to five days. After the transformation, full-color night vision, warehouse access faces and forklift license plates are clear. The boss added perimeter alarm linkage the next month.
In June 2026, a local milk tea chain (8 stores) had to install monitoring in new stores, and the old stores had a variety of equipment that could not be managed uniformly. We made a standardized plan: Uniform equipment model (4 million full color + POE), 4 - 6 roads per store (POS terminal aimed at cash box, operation area, door, warehouse), unified access to cloud management platform — headquarters operation manager mobile phone on an APP tour 8 stores, POS terminal dispute directly adjust cloud video (30 days of local NVR storage + permanent cloud storage of key clips). 8 stores invested a total of RMB 36,000 (including cloud storage annual fee). After the third month of installation, it was used: a store customer complained about drinking foreign objects and claimed compensation. After adjusting the video, it was clear that the customer opened the lid himself and invested, avoiding a false compensation and bad evaluation storm.
| Item | Reference Price | Notes |
|---|---|---|
| CCTV installation (including equipment) | RMB 450–800 per point | 4 million full color POE standard configuration |
| Access control machine installation | RMB 800–1500 per set | Magnetic lock/electric plug lock included |
| License plate recognition barrier gate | RMB 4000–8000 per set | Including identification camera + barrier gate |
| alarm system | From RMB 1500/set | By number of sectors |
| Old System Retrofit Assessment | free of charge | Reuse existing gear solutions and quotes |
| Monitor repair on-site | From RMB 150 | No charge if you can't fix it |
* The above is the reference price, the specific price after inspection/survey shall prevail; batch/enterprise customers can negotiate discounts. Final pricing is subject to the actual on-site inspection.
Three key points: ① Choose big brands (fluorite/millet/Huawei, etc.), change bricks after stopping the APP and reveal privacy;② use indoor PTZ machine at the door/living room, waterproof gun machine in the yard;③ must open the "privacy shielding" function to demarcate the area, do not face the neighbor's doors and windows. Home is generally 1-3 roads, we buy our own equipment to find us to install, installation and debugging RMB 200/road.
According to the number of ways, resolution, hard drive capacity calculation: 4 ways 4 million H.265+ about 20G per day, 1T hard drive storage for about 50 days;16 ways to start 4T. To save longer add hard drive or reduce the bit rate. Important places recommend 30 days to start + key fragments cloud backup.
Three possibilities: ① equipment miscellaneous brand server shutdown (change equipment to cure);② network configuration problems (router port mapping/manufacturer cloud service is not open, we can repair);③ account password lost (find manufacturer complaint). On-site service from RMB 150, diagnosis first and then quote.
We have done factory perimeter (wall infrared radiation + electronic fence linkage monitoring), park access card (canteen/dormitory/workshop authority classification), temporary site monitoring (4G wireless rapid deployment). Large projects go through the complete process of "survey → proposal → quote → construction → acceptance → maintenance", and can provide qualification documents and past case references.
Yes. We do wholesale Guangzhou surveillance, camera/NVR/monitoring disk are wholesale price in stock, buy equipment to send configuration guidance (point advice, storage calculation, APP settings). Installation is also OK, but it is recommended that equipment + construction do--the biggest risk of doing it separately is to blame each other when there is a problem. If we package the whole package, then the equipment failure is free to replace during the warranty period, and the construction problem is free to repair.
Free site survey point map·Old system transformation saves half·Maintenance single connection
Callback within 30 minutes during business hours; outside hours, we contact you before 9:00 next morning.
For urgent repairs call directly 18825126836(24 hours)