Hours: Mon–Sat 09:00–18:00 No.3-8 Jinlong Rd, Dalong St, Panyu · Serving Panyu & Nansha

Enterprise structured cabling engineering

Network cable random pull, signal good or bad, office decoration network paralysis-the root of many network problems are in the wiring. Structured cabling is hidden engineering, a right can be used for ten years, do wrong every day trouble is difficult to rework.

Why is cabling the foundation of a network

Why is cabling the foundation of a network

When corporate networks are stuck, slow, or dropped, the first reaction of many people is to change their routers. In fact, more than 70% of the problems arise from wiring:

  • Bad cable is invisible killer: A large number of copper-clad aluminum and copper-clad iron fake network cables on the market can be used for short distances. If they are long, they will lose speed and packet loss. Gigabit becomes 100 megabytes.
  • Non-standard construction, hidden dangers: the cable is broken core, and strong electricity go a tube (interference), crystal head crimping bad, will cause good or bad persistent disease, check up extremely time-consuming.
  • No labels and drawings: After a long time, no one knows which line goes where, a fault will take half a day, and expansion is impossible to start.
  • Hidden works are difficult to rework: The line is buried in the wall and suspended ceiling. Once it is not laid well, the later rectification will have to open the wall and break the roof, which will cost a lot.

Therefore, structured cabling must be done at one time: use good lines, standardize construction, and keep good documents.

How to choose wiring standards and materials

How to choose wiring standards and materials

Wiring materials a penny a point goods, we insist on using standard products, and the standard clearly let you understand:

  • reticle: Office recommendationsix lines(Gigabit support, cost-effective); 10G demand or new decoration suggestionsSuper Six. resolutely do not use copper clad aluminum false wire, we use the national standard oxygen-free copper wire.
  • optical: Long distance, backbone, room interconnection with optical fiber (OM3/OM4 multimode), anti-interference, fast speed.
  • construction standards: Comply with TIA/EIA-568 standard-horizontal wiring does not exceed 90 meters, strong ELV tube slot, crystal head according to 568B standard crimping.
  • wire arrangement specification: rack patch panel + cable organizer, horizontal and vertical, clear label, both beautiful and easy to maintain.
  • test acceptance: Each information point shall be tested with Fluke or similar instruments, and a test report shall be issued. Non-conformity shall not be delivered.
Our wiring construction process

Our wiring construction process

Standard wiring engineering is a complete set of processes, not as simple as pulling a few wires:

  1. Step 1: Free on-site survey: Understand the office layout, the number of workstations, the location of equipment, and determine the number and direction of information points.
  2. Step 2: Offer a proposal: Provide network topology diagram, bill of materials, construction cycle, and sign the contract after confirmation.
  3. Step 3: Standardize construction: Bridge/conduit laying, threading, crystal head making, PC build rack patch panel, hidden project whole process photo keeping file.
  4. Step 4: Test acceptance: Point by point test connectivity and speed, unqualified immediately rectify.
  5. Step 5: Deliver Documents: Provide point list, test report, wiring drawings, convenient for future maintenance and expansion. Warranty for one year.
⚠️ The biggest hole in wiring is cheap.Some construction teams use copper-clad aluminum false wire, do not do testing, do not leave drawings, quote a low section, but it will not take long to have problems frequently, rework costs far more than the original savings. Wiring is buried in the wall of the project, must use standard materials, do testing, to drawings, these three kinds of one cannot be less.
real case

This is how we help our clients solve problems.

200-person office network transformation, gigabit to desktop

In March 2026, a 200-person e-commerce company in Panyu moved to a new office, requiring gigabit to desktop and wireless full coverage. We designed and implemented six types of cabling solutions: more than 300 information points, fiber optic backbone from the server room to each area, and standard cabling of the entire rack patch panel. Fluke point-by-point testing all met the standards, gigabit to desktop, wireless AC+AP seamless roaming. Complete point bitmap and test report were delivered. Customer administrative feedback: The network has never been so fast and stable.

Factory workshop old network cable frequently dropped, change the line to cure

In May 2026, the network of a factory's production workshop frequently dropped, affecting the scanning and CCTV system. The investigation found that it was a copper-clad aluminum inferior network cable many years ago, plus interference with the power cable laying in the same pipe. We re-laid the Class 6 shielded cable and independently routed the pipe, and the problem of dropping the line was cured. The factory director said: It should have been replaced long ago. Before that, it was tossed by the network every day.

price reference

Test first, quote later, repair later

ItemReference PriceNotes
Free on-site surveyRMB 0Including scheme design
Six types of information pointsRMB 80–120 per pointIncluding materials + construction + testing
fiber splicingRMB 50/coreIncluding OM3/OM4
rack patch panel installationQuotes by SizeConduit line
Old network reconstructionEvaluation offerLine change + remediation

* The above is the reference price, the specific quote after diagnosis shall prevail; batch/enterprise customers can negotiate discounts. Final pricing is subject to the actual on-site inspection.

FAQ

About enterprise structured cabling, we are often asked

Office wiring, how to determine how many information points?

Generally, according to the number of stations ×2 (one office, one spare or telephone) and then add public areas (conference room, printer, wireless AP point). We will give suggestions according to your layout during on-site survey. It is better to leave more spare to avoid difficulties in adding lines later.

Category 6 and Super Category 6, Category 7 network cable, which one to choose for home/office?

General office and home, six categories are fully sufficient (support gigabit, high cost performance). Super six categories are suitable for 10 thousand needs or new decoration want to be in place in one step. Seven categories are mainly used in data centers, general office is not necessary. We recommend according to your actual needs, not with expensive.

Decorated office can also wiring? Do not want to destroy the decoration.

Yes. After decoration, the wiring is exposed (with cable trough, skirting box), and the aesthetics is also good; you can also use the existing pipeline threading. We will give the solution that will not affect the decoration after on-site inspection.

How long does the wiring warranty last? What if something goes wrong?

We guarantee wiring engineering for one year. During the warranty period, failures caused by materials or construction quality are free of on-site treatment. Point diagrams and test reports will be provided when delivery, and subsequent expansion and maintenance are very convenient.

related reading

continue to understand

Encounter enterprise structured cabling problem?

Free preliminary diagnosis· Transparent Quote ·No repair fee if it cannot be repaired·90-day repair warranty

📞 020-39029800 📱 18825126836

📋 Book online · 30-second form

Callback within 30 minutes during business hours; outside hours, we contact you before 9:00 next morning.

For urgent repairs call directly 18825126836(24 hours)

📞 Call 18825126836 Now