Servers are piled up in corners, wires are pulled randomly, and it is hot in summer--the server room of many enterprises is actually a hidden danger. Standardized server room construction, from power supply and distribution, refrigeration to wiring and monitoring, each ring is related to whether the business can operate stably 7×24.

Many enterprises think that the server room is a room for putting a server, and as a result, various hidden dangers are buried:
Standardized server room construction is to turn these invisible risks into controllable guarantees. Investment once, benefit for many years.

Server room construction is a system engineering, usually including these parts, indispensable:

The construction of the server room shall be carried out step by step according to the planning:
In April 2026, the server room of a manufacturing enterprise was a small room without air conditioning in the office building. Every summer, the server frequently crashed due to high temperature. Last year, production data was lost due to power failure. We designed and implemented the transformation of the server room: UPS (30 minutes backup), precision air conditioning, anti-static floor, environmental monitoring and standard wiring. After the transformation, it experienced zero downtime throughout the summer, and the temperature stabilized at 24°C. There was no power failure accident again. The head of enterprise IT said: This renovation was worth it.
In June 2026, a fast-growing start-up company needed to build a small server room that could hold 8 racks in 20 square meters. We made compact design: cold and hot channel layout, line-level precision air conditioning, fiber optic trunk + Class 6 to rack, and full coverage of environmental monitoring. The small space made the effect of professional server room, and reserved the margin for expansion to 12 racks to meet the development in the next three years.
| Item | Reference Price | Notes |
|---|---|---|
| Free Needs Assessment | RMB 0 | Including scheme design |
| UPS power supply and distribution | Quote by power | Battery +PDU included |
| precision air conditioner | Quote by refrigeration capacity | Including installation and debugging |
| rack wiring | Quote by rack | With fiber/copper |
| environmental monitoring | Quotes by Size | Humidity/Smoke/Water |
* The above is the reference price, the specific quote after diagnosis shall prevail; batch/enterprise customers can negotiate discounts. Final pricing is subject to the actual on-site inspection.
If there are only two or three servers, an independent space (small rack room) with air conditioning and UPS is enough, and there is no need to build a standard server room. However, if it carries core business, it has high environmental requirements, or there will be more and more equipment, it is recommended to standardize the construction. We will do the needs assessment first and then give suggestions. We do not advise you to invest too much.
The span is very large. Small racks (several servers) start at tens of thousands of RMB; standard rooms (dozens to dozens of racks) range from hundreds of thousands to millions, depending on the level and configuration. We design solutions according to your actual needs and budget, and spend money on the blade.
It can be transformed. We support non-stop transformation-construction by region and batch, and business is kept online. Planning and temporary support are carried out first, and then gradual relocation and rectification are carried out to minimize the impact on business.
We provide server room O & M services, including 7×24environmental monitoring, periodic inspection, fault response and capacity planning. You can buy only construction, or you can build + O & M integration to us. See the server hosting and O & M topic for details.
Free preliminary diagnosis· Transparent Quote ·No repair fee if it cannot be repaired·90-day repair warranty
Callback within 30 minutes during business hours; outside hours, we contact you before 9:00 next morning.
For urgent repairs call directly 18825126836(24 hours)