IDC data centre construction

Servers are piled up in corners, wires are pulled randomly, and it is hot in summer--the server room of many enterprises is actually a hidden danger. Standardized server room construction, from power supply and distribution, refrigeration to wiring and monitoring, each ring is related to whether the business can operate stably 7×24.

Why can't the server room be dealt with casually?

Why can't the server room be dealt with casually?

Many enterprises think that the server room is a room for putting a server, and as a result, various hidden dangers are buried:

  • Power failure risk: Without UPS, the server will be powered off as soon as the mains stops, the data will be damaged, and the service will be interrupted.
  • overheating downtime: The temperature of ordinary rooms is high in summer, the server will reduce the frequency and crash for a long time, and the hardware life will be greatly reduced.
  • cable cluttering: The wires and cables are pulled randomly, which is neither safe (fire hazard) nor difficult to maintain. It takes a long time to troubleshoot.
  • potential safety hazard: No access control, no monitoring, no fire protection, no knowledge of equipment theft or fire.
  • Unable to expand: There was no planning at the beginning, and there was no room for more equipment and insufficient electricity.

Standardized server room construction is to turn these invisible risks into controllable guarantees. Investment once, benefit for many years.

What systems does a standard server room contain?

What systems does a standard server room contain?

Server room construction is a system engineering, usually including these parts, indispensable:

  • power supply and distribution system: Mains +UPS UPS +PDU power distribution to ensure safe operation or safe shutdown of equipment in case of power failure. More than 30% margin should be left in the power supply capacity.
  • refrigerating system: Precision air conditioning or special refrigeration, the temperature control at 18-27°C. Room heat, is the enemy of the server.
  • Rack and wiring: Standard rack, fiber/copper specification placement, clear labels, strong ELV separation. This determines the efficiency of post-maintenance.
  • environmental monitoring: Real-time monitoring of temperature, humidity, smoke, flooding, UPS status, and automatic alarm for abnormalities.
  • fire protection and security: Gas fire protection (no water!), access control, CCTV, protection equipment and data security.
  • lightning protection: Standard grounding system, lightning protection and antistatic, protection of precision equipment.
Our server room construction process

Our server room construction process

The construction of the server room shall be carried out step by step according to the planning:

  1. Step 1: Needs Assessment: Understand the number of equipment, power, expansion requirements in the next 3-5 years, and determine the equipment room level (refer to GB 50174).
  2. Step 2: Scheme Design: rack layout, power supply and distribution scheme, refrigeration scheme, wiring scheme and equipment list.
  3. Step 3: Civil construction: Anti-static floor, wall insulation, dust prevention treatment, power distribution room preparation.
  4. Step 4: System InstallationUPS, precision air conditioning, rack, wiring, monitoring, fire protection installation and commissioning one by one.
  5. Step 5: Test Delivery: Full load test, power-off switching test, temperature and humidity test, issue completion documents, and provide operation and maintenance training.
⚠️ The easiest place to save money in server room construction:One is to save UPS and precision air conditioning, think first make do, the result is the first power failure or high temperature to pay the price of data; the second is to pull the wiring casually, later expansion maintenance want to cry without tears. The power supply and distribution of the room, refrigeration, wiring these three are the foundation, must not save.
real case

This is how we help our clients solve problems.

Manufacturing enterprise server room transformation, summer no longer downtime

In April 2026, the server room of a manufacturing enterprise was a small room without air conditioning in the office building. Every summer, the server frequently crashed due to high temperature. Last year, production data was lost due to power failure. We designed and implemented the transformation of the server room: UPS (30 minutes backup), precision air conditioning, anti-static floor, environmental monitoring and standard wiring. After the transformation, it experienced zero downtime throughout the summer, and the temperature stabilized at 24°C. There was no power failure accident again. The head of enterprise IT said: This renovation was worth it.

Start-up company small server room, 20 square meters with professional style

In June 2026, a fast-growing start-up company needed to build a small server room that could hold 8 racks in 20 square meters. We made compact design: cold and hot channel layout, line-level precision air conditioning, fiber optic trunk + Class 6 to rack, and full coverage of environmental monitoring. The small space made the effect of professional server room, and reserved the margin for expansion to 12 racks to meet the development in the next three years.

price reference

Test first, quote later, repair later

ItemReference PriceNotes
Free Needs AssessmentRMB 0Including scheme design
UPS power supply and distributionQuote by powerBattery +PDU included
precision air conditionerQuote by refrigeration capacityIncluding installation and debugging
rack wiringQuote by rackWith fiber/copper
environmental monitoringQuotes by SizeHumidity/Smoke/Water

* The above is the reference price, the specific quote after diagnosis shall prevail; batch/enterprise customers can negotiate discounts. Final pricing is subject to the actual on-site inspection.

FAQ

Regarding the construction of server rooms, everyone often asks

We only have a few servers. Do we need to build a special server room?

If there are only two or three servers, an independent space (small rack room) with air conditioning and UPS is enough, and there is no need to build a standard server room. However, if it carries core business, it has high environmental requirements, or there will be more and more equipment, it is recommended to standardize the construction. We will do the needs assessment first and then give suggestions. We do not advise you to invest too much.

How much is the budget for server room construction?

The span is very large. Small racks (several servers) start at tens of thousands of RMB; standard rooms (dozens to dozens of racks) range from hundreds of thousands to millions, depending on the level and configuration. We design solutions according to your actual needs and budget, and spend money on the blade.

The old server room is too messy. Can it be reconstructed? Should it be closed down?

It can be transformed. We support non-stop transformation-construction by region and batch, and business is kept online. Planning and temporary support are carried out first, and then gradual relocation and rectification are carried out to minimize the impact on business.

What about the operation and maintenance after the equipment room is built?

We provide server room O & M services, including 7×24environmental monitoring, periodic inspection, fault response and capacity planning. You can buy only construction, or you can build + O & M integration to us. See the server hosting and O & M topic for details.

related reading

continue to understand

Encounter server room construction problems?

Free preliminary diagnosis· Transparent Quote ·No repair fee if it cannot be repaired·90-day repair warranty

📞 020-39029800 📱 18825126836

📋 Book online · 30-second form

Callback within 30 minutes during business hours; outside hours, we contact you before 9:00 next morning.

For urgent repairs call directly 18825126836(24 hours)

📞 Call 18825126836 Now